Reorder point and safety stock calculator
Reorder too late and you run out while the supplier ships; reorder too early and cash sits on a shelf. The reorder point is the stock level at which the next order must go out, and safety stock is the reserve that covers the days you sell more than usual. For any business that keeps stock: a shop, a warehouse, a kitchen, a workshop.
Free, no signup, nothing stored. The numbers live in the URL, so a result is a link you can share, and the page works with JavaScript switched off.
The answer
Reorder in about 6 days.
- Reorder pointOrder when stock falls to this
- 634 units
- Safety stockz = 1.64 at 95%
- 74 units
- Sales during lead time
- 560 units
- Order quantity (EOQ)About 17.4 orders a year
- 837 units
- Days of coverStock on hand ÷ daily sales
- 22.5 days
Shareable result: https://www.magistry.io/tools/reorder-point-calculator?demand=40&sd=12&lead=14&service=95&stock=900&order_cost=60&hold_cost=2.5
Magistry reads sales per product every day, warns before a best-seller runs out and pauses ads on what is nearly gone. Start on the free plan, or open the demo first.
The formulas
safety stock = z × σ(daily sales) × √lead timereorder point = daily sales × lead time + safety stockEOQ = √(2 × daily sales × 365 × cost per order ÷ holding cost per unit per year)days of cover = stock on hand ÷ daily sales
With the example on this page: 40 a day for 14 days is 560 units sold while the order is on its way. At a 95% service level z is 1.64, so safety stock is 1.64 × 12 × √14 = 74 units and the reorder point is 634. With 900 on hand that is about 6 days away, and an order of about 840 units keeps ordering and holding costs lowest.
Service level and z
Safety stock grows with z. The last few percent cost the most.
| Service level | z | Safety stock with these numbers |
|---|---|---|
| 90% | 1.28 | 58 units |
| 95% | 1.64 | 74 units |
| 97.5% | 1.96 | 89 units |
| 99% | 2.33 | 105 units |
| 99.9% | 3.09 | 139 units |
Questions
How do I calculate the reorder point?
Multiply average daily sales by the supplier's lead time in days, and add your safety stock. Selling 40 a day with a 14-day lead time uses 560 units while you wait; with 74 units of safety stock, you reorder when stock falls to 634.
How much safety stock do I need?
Safety stock = z × the standard deviation of daily sales × √lead time. z comes from the service level you want: 1.28 for 90%, 1.64 for 95%, 2.33 for 99%. With daily sales that vary by 12 units and a 14-day lead time, 95% takes 1.64 × 12 × √14 = 74 units.
What is a service level?
The share of reorder cycles in which you do not run out before the new stock arrives. 95% means one stock-out in twenty cycles. Each step up costs more stock than the last: going from 95% to 99% raises safety stock by about 40%.
How do I find the standard deviation of daily sales?
Take the units sold per day for the last 60 to 90 days and use STDEV in Excel or Google Sheets. Leave out days you were out of stock, because a zero there is missing demand, not low demand. If you only know a weekly figure, divide its standard deviation by √7.
What is the economic order quantity?
The order size that keeps the cost of ordering and the cost of holding stock lowest together: √(2 × yearly demand × cost per order ÷ yearly holding cost per unit). Treat it as a starting point and round it to the supplier's pack size or minimum order.
Does this calculator store what I type?
No. The answer is computed on the server from the values in the URL. Only an anonymous count that the calculator was used is kept, with no IP address and none of your numbers.
More free tools
- Free shipping threshold calculatorThe lowest free shipping threshold that pays for itself.
- Churn rate and MRR growth calculatorWhat monthly churn does to recurring revenue.
- Profit planner spreadsheet templateFree Excel and Google Sheets P&L, ROAS and ad budget planner.
- AI readiness scanCan ChatGPT, Perplexity and Gemini read your site?
- Merchant Center product data checkThe attributes Google Merchant Center rejects listings over.
- Break-even ROAS calculatorThe ROAS where ad spend stops paying for itself.
Last reviewed 2026-11-27. Found an error in a formula? Mail support@magistry.io.